![]() The same time, ensures processes are more efficient and more stableįor completely new future production structures, the BMW Group will This reduces planning effort and capital expenditure and, at Integrate the virtual product into the virtual factory at an early Locations and across different time zones. New level, by enabling collaboration in real time between different Virtualisation takes planning for all processes to a Simulation of all processes and the entire production system 100 Is a core element of digitalisation within the strategic vision of BMW Melchiorre, head of Production System, Planning, Tool Shop, PlantĪlongside data science and artificial intelligence, virtual planning Highly efficient, precise and flexible manner,” says Michele Planning and smaller-scale remodelling of existing structures in a “This opens upĮntirely new possibilities for us to implement both extensive new Of future plant structures and production facilities. ![]() Way, the company is systematically merging the real and virtual worldsĪnd tapping into the enormous potential for highly efficient planning By early 2023, the BMW Group will have aĭigital scan of every one of its vehicle plants worldwide.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |